| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076908 | Name of Scheme: RAICHA GRAM PANCHAYAT WATER SUPPLY | No. of Villages: 1 | No. of Habitation Covered: 15 |
| Total Population Covered: 6526 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 27-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 23.96 M / 107.36 M | RAICHA | 26.515358 | 81.858691 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 800 LPM /50 M | RAICHA | 26.515358 | 81.858691 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250 KL / 18 M | RAICHA | 26.515358 | 81.858691 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 150 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6:Class PE-100 | 63 | 11.501 | |
| 2 | HDPE / PN-6:Class PE-100 | 75 | 4.363 | |
| 3 | HDPE / PN-6:Class PE-100 | 90 | 1.375 | |
| 4 | HDPE / PN-6:Class PE-100 | 110 | 1.265 | |
| 5 | HDPE / PN-6:Class PE-100 | 125 | 1.004 | |
| 6 | HDPE / PN-6:Class PE-100 | 140 | 1.555 | |
| 7 | HDPE / PN-6:Class PE-100 | 160 | 0.852 | |
| 8 | HDPE / PN-6:Class PE-100 | 180 | 1.061 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 822 |