Project Completion Certificate (Ground Water)
Scheme ID: 20077258 Name of Scheme: Kishwakhera & udanpur No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2020 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 19-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.42/139.93 Kishwakhera & udanpur 26.424903 79.81455
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 450/67 Kishwakhera & udanpur 26.424903 79.81455
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/20 Kishwakhera & udanpur 26.424903 79.81455
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.01410
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.853
2 HDPE 90 6.384
3 HDPE 110 0.319
4 HDPE 140 0.231
5 HDPE 160 0.904
6 HDPE 180 1.734
HSC Connection
Sno. Total Nos.
1 486
Other Details
3.23
0.00
2.62
22-Mar-2024
23-Mar-2024