Project Completion Certificate (Ground Water)
Scheme ID: 20077372 Name of Scheme: PANWARI WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.00/100.00 PANWARI 28.089586 79.925986
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 25.02 M3/43 M PANWARI 28.089586 79.925986
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 15 KL - 12 M PANWARI 28.089502 79.925911
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K 7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6 KG 63 4.452
2 HDPE / 6 KG 75 0.865
3 HDPE / 6 KG 90 0.129
4 HDPE / 6 KG 110 0.039
5 HDPE / 6 KG 140 0.064
HSC Connection
Sno. Total Nos.
1 314
Other Details
0.89
0.00
0.89
29-May-2024
06-Dec-2024