Project Completion Certificate (Ground Water)
Scheme ID: 20077599 Name of Scheme: mandauli No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 7597 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Mar-2024 Actual Date of Completion (Capex): 26-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 59.34/444.49 MANDAULI 26.491192 79.994651
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850/74 MANDAULI 26.491192 79.994651
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500/18 MANDAULI 26.491192 79.994651
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.574
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.884
2 HDPE 90 3.564
3 HDPE 110 1.975
4 HDPE 125 1.614
5 HDPE 140 0.493
6 HDPE 160 0.348
7 HDPE 180 0.411
8 HDPE 200 1.372
HSC Connection
Sno. Total Nos.
1 1357
Other Details
7.48
0.00
6.13
10-Apr-2024
11-Apr-2024