Project Completion Certificate (Ground Water)
Scheme ID: 20078147 Name of Scheme: PITAMBARPURKALA WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1400 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Mar-2024 Actual Date of Completion (Capex): 23-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 19.00/88.30 PITAMBARPURKALA 26.213807 82.081609
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 300LPM/43M PITAMBARPURKALA 26.213807 82.081609
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL/12M PITAMBARPURKALA 26.213807 82.081609
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 4.354
2 HDPE-PN-6 , PE-100 75 1.782
3 HDPE-PN-6 , PE-100 90 0.252
4 HDPE-PN-6 , PE-100 110 1.093
5 HDPE-PN-6 , PE-100 140 0.048
HSC Connection
Sno. Total Nos.
1 250
Other Details
1.54
0.00
1.51
12-Dec-2025
01-May-2026