Project Completion Certificate (Ground Water)
Scheme ID: 20078419 Name of Scheme: MUBARIKPUR, PACHGAONPATTI & SANWAL No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 4996 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 27-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.19 Mtr / 107.29 Mtr Mubarikpur - Pachgaon Patti Sanwal 28.941288 77.824604
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Tubewell 1050 LPM / 58 Mtr Mubarikpur - Pachgaon Patti Sanwal 28.941288 77.824604
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Submersible 1050 LPM / 58 Mtr Mubarikpur - Pachgaon Patti Sanwal 28.941288 77.824604
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0261
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.3246
2 HDPE 90 2.579
3 HDPE 110 0.620
4 HDPE 125 0.560
5 HDPE 140 0.251
6 HDPE 160 0.463
7 HDPE 200 3.606
HSC Connection
Sno. Total Nos.
1 877
Other Details
5.11
5.11
3.99
13-Aug-2025
14-Aug-2025