Project Completion Certificate (Ground Water)
Scheme ID: 20078674 Name of Scheme: DARIAPURPATTI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1355 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Mar-2025 Actual Date of Completion (Capex): 30-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mm Dia Plain Pipe 50.52 Dariyapur Patti 27.0620451 79.939442
2 200mm Dia Slotted Pipe 11 Dariyapur Patti 27.0620451 79.939442
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 300/66 Dariyapur Patti 27.0620451 79.939442
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZnAl Tank 150/16 Dariyapur Patti 27.0620451 79.939442
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 80 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Distribution/HDPE 63 2.733
2 Distribution/HDPE 75 0.486
3 Distribution/HDPE 110 0.586
HSC Connection
Sno. Total Nos.
1 251
Other Details
2.18
0.00
0.00
01-Oct-2025
02-Oct-2025