Project Completion Certificate (Ground Water)
Scheme ID: 20079142 Name of Scheme: PRATAPPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 14-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 22.25/137.03 Pratappur 25.988557 80.539157
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible Pump 600/59 Pratappur 25.988557 80.539157
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 Pratappur 25.988557 80.539157
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 4.095
2 HDPE Pipe 75 0.128
3 HDPE Pipe 110 2.363
4 HDPE Pipe 140 1.177
5 HDPE Pipe 160 0.211
6 HDPE Pipe 180 0.319
7 HDPE Pipe 200 0.029
HSC Connection
Sno. Total Nos.
1 495
Other Details
2.40
0.00
2.39
14-Nov-2024
14-Nov-2025