Project Completion Certificate (Ground Water)
Scheme ID: 20079413 Name of Scheme: Shyami Wala Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4715 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 11-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.2 / 135.84 SHYAMI WALA 29.699894 78.240297
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 970 / 60 SHYAMI WALA 29.699894 78.240297
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 16 MTR SHYAMI WALA 29.699894 78.240297
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.61
2 HDPE 75 0.4232
3 HDPE 90 0.2573
4 HDPE 110 0.1671
5 HDPE 125 0.1035
6 HDPE 140 0.0511
7 HDPE 160 0.06
8 HDPE 180 0.131
9 HDPE 200 0.252
HSC Connection
Sno. Total Nos.
1 691
Other Details
2.97
0.00
2.98
11-Nov-2025
12-Nov-2025