| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20081869 | Name of Scheme: PIPLAUTI KHURD MUSTKAM SVS (O) | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2477 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 20-Apr-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Pump | 12.10/98.47 | Piplauti Khurd | 28.678097 | 78.235315 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump | 217/44 | Piplauti Khurd | 28.678097 | 78.235315 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 75/12 | Piplauti Khurd | 28.678108 | 78.235377 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 75 | 0.3665 | |
| 2 | PN-6 PE100/HDPE | 63 | 4.0491 | |
| 3 | PN-6 PE100/HDPE | 110 | 0.2088 | |
| 4 | PN-6 PE100/HDPE | 125 | 0.0204 | |
| 5 | PN-6 PE100/HDPE | 140 | 0.6451 | |
| 6 | PN-6 PE100/HDPE | 160 | 0.135 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 496 |