Scheme ID: 20082989 Name of Scheme: CHIKANIADEEH & BELAULI GOV WSS No. of Villages: 4 No. of Habitation Covered: 7
Total Population Covered: 6405 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Apr-2023 Actual Date of Completion (Capex): 28-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 133.42(m)/30.04(m) Belauli 26.915391 83.205443
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 890 LPM/45(M) Belauli 26.915333 83.205422
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 250kl/14m Belauli 26.915142 83.205292
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K-7 150 0.02285
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE-100 PN 6/HDPE 63 13.599
2 PE-100 PN 6/HDPE 75 6.638
3 PE-100 PN 6/HDPE 90 2.505
4 PE-100 PN 6/HDPE 110 1.656
5 PE-100 PN 6/HDPE 140 0.759
6 PE-100 PN 6/HDPE 160 0.484
7 PE-100 PN 6/HDPE 180 0.628
HSC Connection
Sno. Total Nos.
1 956
Other Details
2.90
3.11
3.11
28-Jun-2025
29-Jun-2025