Project Completion Certificate (Ground Water)
Scheme ID: 20084419 Name of Scheme: CHITAEPUR & DEVALPUR WSS No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 3790 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 21-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00/77.30 CHITAEPUR & DEVALPUR 26.33425 82.992528
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 788LPM/45M CHITAEPUR & DEVALPUR 26.33425 82.992528
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/12M CHITAEPUR & DEVALPUR 26.33425 82.992528
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 19.330
2 HDPE-PN-6 , PE-100 75 1.157
3 HDPE-PN-6 , PE-100 90 1.018
4 HDPE-PN-6 , PE-100 110 0.487
5 HDPE-PN-6 , PE-100 140 0.421
6 HDPE-PN-6 , PE-100 160 0.583
7 HDPE-PN-6 , PE-100 180 0.511
8 HDPE-PN-6 , PE-100 200 0.375
HSC Connection
Sno. Total Nos.
1 720
Other Details
3.01
0.00
2.98
24-Apr-2026
01-May-2026