Project Completion Certificate (Ground Water)
Scheme ID: 20084699 Name of Scheme: Shauri garhiya No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2984 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 04-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24m/125.29m Sauhari Gariha 26.594481 79.394502
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 650LPM/49M Sauhari Gariha 26.594481 79.394502
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/16M Sauhari Gariha 26.594481 79.394502
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0116
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.620
2 HDPE 90 2.543
3 HDPE 110 0.9874
4 HDPE 125 0.569
5 HDPE 140 0.4627
6 HDPE 160 0.7696
7 HDPE 180 0.3514
HSC Connection
Sno. Total Nos.
1 519
Other Details
2.38
0.00
2.47
01-Jun-2022
05-Mar-2025