Project Completion Certificate (Ground Water)
Scheme ID: 20084703 Name of Scheme: Rosangpur PWS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2795 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jul-2021 Actual Date of Completion (Capex): 13-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.8M/121.31M Rosangpur 26.493278 79.3735
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750LPM/61M Rosangpur 26.493278 79.3735
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/14M Rosangpur 26.493278 79.3735
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 9.00
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5697
2 HDPE 90 959
3 HDPE 110 302
4 HDPE 125 248
5 HDPE 140 489
HSC Connection
Sno. Total Nos.
1 853
Other Details
2.41
0.00
0.00
12-May-2026
14-May-2026