Project Completion Certificate (Ground Water)
Scheme ID: 20084709 Name of Scheme: Lakhanpur PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3014 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 08-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24 M / 132.28 M LAKHANPUR 26.724637 76.619747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650 LPM / 53 M LAKHANPUR 26.724637 76.619747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL / 16 M LAKHANPUR 26.724637 76.619747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.008
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.6495
2 HDPE 90 1.735
3 HDPE 110 0.276
4 HDPE 140 0.953
5 HDPE 160 0.657
6 HDPE 200 0.468
HSC Connection
Sno. Total Nos.
1 659
Other Details
2.49
0.00
2.49
06-Jul-2024
08-Jul-2024