Project Completion Certificate (Ground Water)
Scheme ID: 20084711 Name of Scheme: Chandauli PWS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2061 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 05-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.45 M / 73.15 M CHANDAULI 26.839463 79.464419
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 49 M CHANDAULI 26.839463 79.464419
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL / 12 M CHANDAULI 26.839463 79.464419
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0184
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.904
2 HDPE 90 1.6665
3 HDPE 110 2.1375
4 HDPE 125 0.323
HSC Connection
Sno. Total Nos.
1 365
Other Details
1.88
0.00
1.89
04-Aug-2025
06-Aug-2025