Scheme ID: 20084762 Name of Scheme: BHARKHARE WSS No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 2540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Mar-2023 Actual Date of Completion (Capex): 23-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 14/53.80 BHARKHARE 26.12888 82.15035
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 531LPM/45M BHARKHARE 26.12888 82.15035
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M BHARKHARE 26.12904 82.15036
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 8.812
2 HDPE-PN-6 , PE-100 75 1.959
3 HDPE-PN-6 , PE-100 90 1.205
4 HDPE-PN-6 , PE-100 110 0.455
5 HDPE-PN-6 , PE-100 125 0.157
6 HDPE-PN-6 , PE-100 140 0.325
7 HDPE-PN-6 , PE-100 160 1.067
8 HDPE-PN-6 , PE-100 200 0.291
HSC Connection
Sno. Total Nos.
1 350
Other Details
2.22
2.22
2.21
28-Oct-2025