Project Completion Certificate (Ground Water)
Scheme ID: 20085015 Name of Scheme: MUDIA PARMAR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2590 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00/89.29 MUDIA PARMAR 27.9679383 80.0171233
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 31.26 M3 / 45 M MUDIA PARMAR 27.9679383 80.0171233
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150 KL - 12 M MUDIA PARMAR 27.9679315 80.0171289
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.950
2 HDPE / 6KG 75 0.761
3 HDPE / 6KG 90 1.166
4 HDPE / 6KG 110 0.150
5 HDPE / 6KG 140 0.085
HSC Connection
Sno. Total Nos.
1 510
Other Details
1.74
0.00
1.74
13-Sep-2024
06-Dec-2024