Project Completion Certificate (Ground Water)
Scheme ID: 20085704 Name of Scheme: Baraiepur No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2190 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Jan-2025 Actual Date of Completion (Capex): 20-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/63.73 Bareipur 26.76 83.56
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 27/45 Bareipur 26.76 83.56
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 125/18 Bareipur 26.76 83.56
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.18 Laying Completed
2 HDPE 75 0.07 Laying Completed
3 hdpe 110 0.57 Laying Completed
HSC Connection
Sno. Total Nos.
1 370
Other Details
1.78
0.00
1.77
19-Oct-2024
20-Oct-2026