Project Completion Certificate (Ground Water)
Scheme ID: 20085824 Name of Scheme: FATEHPUR MAWAIYA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2536 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2024 Actual Date of Completion (Capex): 22-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MS PIPE 200MM AND 150MM 28M/320.3M FATEHPUR MAWAIYA 26.231176 81.452692
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550LPM/56M FATEHPUR MAWAIYA 26.231176 81.452692
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/18M FATEHPUR MAWAIYA 26.231176 81.452692
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.817
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63MM TO 160MM 160 13.529
HSC Connection
Sno. Total Nos.
1 505
Other Details
3.07
0.00
3.06
26-Mar-2026
01-Jun-2026