Project Completion Certificate (Ground Water)
Scheme ID: 20086689 Name of Scheme: Barwa Kripal GP Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2120 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-Nov-2024 Actual Date of Completion (Capex): 24-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW Plain Pipe DIA-200MM 36.20 BARWA KRIPAL 27.333992 83.706495
2 MSERW Plain Pipe DIA-150MM 116.12 BARWA KRIPAL 27.333992 83.706495
3 MSERW SLOTTED PIPE DIA-150MM 18 BARWA KRIPAL 27.333992 83.706495
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 26.99/37 BARWA KRIPAL 27.333992 83.706495
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 REGULAR OHT 150KL/12M BARWA KRIPAL 27.333766 83.706851
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGED PIPE/DI 150 0.0265
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6,PE-100/HDPE 63 1.187
2 PN-6,PE-100/HDPE 75 0.633
3 PN-6,PE-100/HDPE 90 0.906
4 PN-6,PE-100/HDPE 110 400
HSC Connection
Sno. Total Nos.
1 210
Other Details
1.35
0.00
1.35
25-Aug-2026
25-Aug-2026