Scheme ID: 20086964 Name of Scheme: Murali GP Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3803 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2024 Actual Date of Completion (Capex): 15-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW PLAIN PIPE-300MM 36.16M MURALI 27.307206 83.430752
2 MSERW SLOTTED PIPE-150MM 22.0M MURALI 27.307206 83.430752
3 MSERW PLAIN PIPE-150MM 90.1M MURALI 27.307206 83.430752
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 47.99/37 MURALI 27.307206 83.430752
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 REGULAR OHT 250KL/12M MURALI 27.072583 83.482363
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE DI-K9 150 0.0256
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6/PE-100/HDPE 63 3887.07
2 PN-6/PE-100/HDPE 75 2573.8
3 PN-6/PE-100/HDPE 90 2336.174
4 PN-6/PE-100/HDPE 110 2063.99
5 PN-6/PE-100/HDPE 140 114.24
6 PN-6/PE-100/HDPE 160 253
HSC Connection
Sno. Total Nos.
1 625
Other Details
2.03
0.00
2.41
15-Jun-2026