| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20086977 | Name of Scheme: MAJHA KAMHARIYA WSS | No. of Villages: 2 | No. of Habitation Covered: 11 |
| Total Population Covered: 4940 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 04-Oct-2024 | Actual Date of Completion (Capex): 28-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Borewell Assembly | 36.21 M/ 47.84 M | Manjha Khamariya | 26.362804 | 83.10294 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.5 HP Submersible Pump Set | 1030 LPM/ 45 M | Manjha Khamariya | 26.362804 | 83.10294 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 300 KL/ 14 M | Manjha Khamariya | 26.362804 | 83.10294 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- K7 | 150 | 0.04 | 0.019 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 2.950 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.586 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 10.852 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 1.990 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 5.205 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.594 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.853 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 200 | 2.248 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 999 |