Project Completion Certificate (Ground Water)
Scheme ID: 20087348 Name of Scheme: CHAUHATA WATER SUPPLY SCHEME RO No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1320 Base Year: 2023 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 18-Jul-2023 Actual Date of Completion (Capex): 17-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 09/33.5 chauhata 25.953353 80.951447
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible pump(7.5hp) 120/55 chauhata 25.953353 80.951447
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50/12 chauhata 25.953353 80.951447
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.428
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.80460
2 HDPE 75 0.78920
3 HDPE 90 0.523
4 HDPE 110 0.698
5 HDPE 125 0.47850
6 HDPE 140 0.20550
7 HDPE 160 0.323
8 HDPE 180 0.03
HSC Connection
Sno. Total Nos.
1 196
Other Details
1.41
0.00
1.38
15-Jan-2026
16-Jan-2026