Project Completion Certificate (Ground Water)
Scheme ID: 20087729 Name of Scheme: NAGLA SALEHADI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Mar-2024 Actual Date of Completion (Capex): 15-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.15 Mtr /148.35 Mtr NAGLA SALEDHI 26.664379* 79.246551*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 21 M^3/53 Mtr NAGLA SALEDHI 26.664379* 79.246551*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL/12 Mtr NAGLA SALEDHI 26.664379* 79.246551*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.234
2 HDPE 75 0.811
3 HDPE 90 1.451
4 HDPE 110 1.173
5 HDPE 140 0.820
6 HDPE 160 0.518
HSC Connection
Sno. Total Nos.
1 347
Other Details
1.39
1.81
1.81
05-Oct-2024
06-Oct-2024