Project Completion Certificate (Ground Water)
Scheme ID: 20087921 Name of Scheme: Rampur Chajmal Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 3005 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Dec-2025 Actual Date of Completion (Capex): 01-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 6.33
2 HDPE PIPE PN -6: CLASS PE -100 75 0.17
3 HDPE PIPE PN -6: CLASS PE -100 90 0.12
4 HDPE PIPE PN -6: CLASS PE -100 160 2.20
5 HDPE PIPE PN -6: CLASS PE -100 180 0.21
6 HDPE PIPE PN -6: CLASS PE -100 200 0.05
HSC Connection
Sno. Total Nos.
Other Details
2.44
2.44
2.12
31-Dec-2025
01-Jan-2026