Project Completion Certificate (Ground Water)
Scheme ID: 20088642 Name of Scheme: Pakhanpur & Saidpura Gajju Water Supply Scheme No. of Villages: 6 No. of Habitation Covered: 6
Total Population Covered: 4783 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 20-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.12 / 144.47 PAKHANPUR AND SAIDPUR GAJJU 29.372318 78.421173
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 950 / 60 PAKHANPUR AND SAIDPUR GAJJU 29.372318 78.421173
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL / 16 MTR PAKHANPUR AND SAIDPUR GAJJU 29.372318 78.421173
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.041
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 9.2397
2 HDPE PIPE 75 0.6
3 HDPE PIPE 90 2.0939
4 HDPE PIPE 110 0.2351
5 HDPE PIPE 125 0.1025
6 HDPE PIPE 140 0.0712
7 HDPE PIPE 160 0.0437
8 HDPE PIPE 180 0.3546
HSC Connection
Sno. Total Nos.
Other Details
3.26
0.00
3.26
20-Nov-2025
21-Nov-2025