Project Completion Certificate (Ground Water)
Scheme ID: 20088685 Name of Scheme: Bhadsan & Warwai PWS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 6056 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 03-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 48 M / 258.43 M BHADSAN 26.61944 79.30239
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 58 M BHADSAN 26.61944 79.30239
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325 KL / 16M BHADSAN 26.61944 79.303239
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.5087
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.2564
2 HDPE 90 5.6681
3 HDPE 110 2.479
4 HDPE 125 0.081
5 HDPE 160 0.633
6 HDPE 180 0.686
HSC Connection
Sno. Total Nos.
1 1103
Other Details
4.57
0.00
4.68
02-Mar-2025
04-Mar-2025