| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20088691 | Name of Scheme: Ali & Tilakpur sarmai PWS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 6775 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 25-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 50.08 M / 250.58 M | AILI TILAKPUR | 26.678495 | 79.575165 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 725 LPM / 58 M | AILI TILAKPUR | 26.678495 | 79.575165 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 400 KL / 16 M | AILI TILAKPUR | 26.678495 | 79.575165 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0125 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 10.611 | |
| 2 | HDPE | 90 | 6.167 | |
| 3 | HDPE | 110 | 0.439 | |
| 4 | HDPE | 125 | 1.231 | |
| 5 | HDPE | 140 | 1.321 | |
| 6 | HDPE | 160 | 0.242 | |
| 7 | HDPE | 180 | 1.176 | |
| 8 | HDPE | 200 | 0.617 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 465 |