| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089032 | Name of Scheme: GUMTA, JHAPKA DILWARPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2400 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 18-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.00/96.00 | GUMTA JHAPKA DILAWERPUR | 27.832495 | 79.69369 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump - 1 | 37.2 / 45 M | GUMTA JHAPKA DILAWERPUR | 27.832495 | 79.69369 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 175 KL - 16 M | GUMTA JHAPKA DILAWERPU | 27.832431 | 79.69314 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6 KG | 63 | 4.042 | |
| 2 | HDPE / 6 KG | 75 | 1.655 | |
| 3 | HDPE / 6 KG | 90 | 2.642 | |
| 4 | HDPE / 6 KG | 110 | 0.140 | |
| 5 | HDPE / 6 KG | 140 | 0.198 | |
| 6 | HDPE / 6 KG | 160 | 1.699 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 592 |