| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089111 | Name of Scheme: DARA NAGAR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 6433 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 19-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 30.16 / 125.47 | Daranagar BA | 29.280393 | 78.110485 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 1300 / 54 | Daranagar BA | 29.280393 | 78.110485 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 375 / 18 | Daranagar BA | 29.280393 | 78.110485 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 200 | 0.050 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.561 | |
| 2 | HDPE | 75 | 0.368 | |
| 3 | HDPE | 90 | 1.696 | |
| 4 | HDPE | 110 | 0.262 | |
| 5 | HDPE | 125 | 0.189 | |
| 6 | HDPE | 140 | 3.114 | |
| 7 | HDPE | 160 | 0.252 | |
| 8 | HDPE | 180 | 0.189 | |
| 9 | DI - K7 | 250 | 0.235 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1478 |