| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089339 | Name of Scheme: RANMASTPUR | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 3450 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-Mar-2024 | Actual Date of Completion (Capex): 30-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24/106.35 | Ranmastpur | 25.912783 | 80.554763 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submerssible Pump 20 HP | 700/63 | Ranmastpur | 25.912783 | 80.554763 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/16 | Ranmastpur | 25.912783 | 80.554763 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 6.673 | |
| 2 | HDPE PIPE | 75 | 0.517 | |
| 3 | HDPE PIPE | 90 | 1.454 | |
| 4 | HDPE PIPE | 110 | 0.338 | |
| 5 | HDPE PIPE | 125 | 0.871 | |
| 6 | HDPE PIPE | 180 | 0.173 | |
| 7 | HDPE PIPE | 200 | 1.501 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 575 |