| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089657 | Name of Scheme: Ajuapur PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1685 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 14-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 15 mtr/ 109.80 mtr | Ajuapur | 26.724637 | 26.724637 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 300 lpm/ 61 m | Ajuapur | 26.724637 | 26.724637 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75 KL/ 14M | Ajuapur | 26.724637 | 26.724637 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.450 | |
| 2 | HDPE | 90 | 2.037 | |
| 3 | HDPE | 110 | 0.295 | |
| 4 | HDPE | 125 | 0.260 | |
| 5 | HDPE | 140 | 0.262 | |
| 6 | HDPE | 160 | 0.250 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 354 |