Project Completion Certificate (Ground Water)
Scheme ID: 20089913 Name of Scheme: FARMAPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1340 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 07-Jun-2024 Actual Date of Completion (Capex): 27-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 14/84 FARMAPUR 26.016478 82.352464
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 290LPM/43M FARMAPUR 26.016478 82.352464
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL/12M FARMAPUR 26.016612 82.352521
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 80 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 11.7705
2 HDPE-PN-6 , PE-100 75 0.924
3 HDPE-PN-6 , PE-100 90 0.701
4 HDPE-PN-6 , PE-100 110 0.4165
5 HDPE-PN-6 , PE-100 140 0.285
HSC Connection
Sno. Total Nos.
1 189
Other Details
1.57
1.57
1.57
29-Jul-2026
01-Aug-2026