| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089948 | Name of Scheme: MALIK PUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 5020 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Mar-2025 | Actual Date of Completion (Capex): 28-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200MM DIA PLAIN PIPE | 60 | MALIKPUR | 27.17407 | 79.68485 |
| 2 | 150MM DIA PLAIN PIPE | 57.30 | MALIKPUR | 27.17407 | 79.68485 |
| 3 | 150MM DIA SLOTTED PIPE | 18 | MALIKPUR | 27.17407 | 79.68485 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 420/71 | MALIKPUR | 27.17407 | 79.68485 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZN-AL TANK | 250/14 | MALIKPUR | 27.17407 | 79.68485 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 150 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution Pipe/HDPE | 63 | 7.059 | |
| 2 | Distribution Pipe/HDPE | 75 | 0.325 | |
| 3 | Distribution Pipe/HDPE | 90 | 3.392 | |
| 4 | Distribution Pipe/HDPE | 110 | 0.111 | |
| 5 | Distribution Pipe/HDPE | 140 | 1.066 | |
| 6 | Distribution Pipe/HDPE | 160 | 0.438 | |
| 7 | Distribution Pipe/HDPE | 180 | 0.085 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 944 |