Project Completion Certificate (Ground Water)
Scheme ID: 20089948 Name of Scheme: MALIK PUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5020 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Mar-2025 Actual Date of Completion (Capex): 28-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200MM DIA PLAIN PIPE 60 MALIKPUR 27.17407 79.68485
2 150MM DIA PLAIN PIPE 57.30 MALIKPUR 27.17407 79.68485
3 150MM DIA SLOTTED PIPE 18 MALIKPUR 27.17407 79.68485
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 420/71 MALIKPUR 27.17407 79.68485
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZN-AL TANK 250/14 MALIKPUR 27.17407 79.68485
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Distribution Pipe/HDPE 63 7.059
2 Distribution Pipe/HDPE 75 0.325
3 Distribution Pipe/HDPE 90 3.392
4 Distribution Pipe/HDPE 110 0.111
5 Distribution Pipe/HDPE 140 1.066
6 Distribution Pipe/HDPE 160 0.438
7 Distribution Pipe/HDPE 180 0.085
HSC Connection
Sno. Total Nos.
1 944
Other Details
3.46
0.00
0.00
29-Jul-2026
30-Jul-2026