Project Completion Certificate (Ground Water)
Scheme ID: 20091015 Name of Scheme: ATHAI WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2966 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 35.05/120.57 ATHAI 29.058094 78.206982
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 610/48 ATHAI 29.058094 78.206982
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175/12 ATHAI 29.058094 78.206982
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.954
2 HDPE 75 0.253
3 HDPE 90 0.344
4 HDPE 110 0.415
5 HDPE 125 0.352
6 HDPE 140 0.382
HSC Connection
Sno. Total Nos.
1 522
Other Details
1.66
0.00
2.14
10-May-2026
11-May-2026