| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091159 | Name of Scheme: Lohiyapur PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 3476 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 06-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.06 M / 129.30 M | LOHIYAPUR | 26.465442 | 79.563889 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 500 LPM / 61 M | LOHIYAPUR | 26.465442 | 79.563889 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 14 M | LOHIYAPUR | 26.465442 | 79.563889 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.9165 | |
| 2 | HDPE | 90 | 1.684 | |
| 3 | HDPE | 110 | 0.576 | |
| 4 | HDPE | 125 | 0.168 | |
| 5 | HDPE | 140 | 1.490 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 627 |