| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20091383 | Name of Scheme: EKLAHRA & RAIPUR CHINGHATPUR MVS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 4111 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 28-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24 M / 106.30 M | EKLAHRA | 27.65677 | 79.29492 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 850 LPM / 61 M | EKLAHRA | 27.65677 | 79.29492 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250 KL / 14 M | EKLAHRA | 27.65677 | 79.29492 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .036 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE 6KG | 90 | 3.214 | COMPLETE |
| 2 | HDPE 6KG | 63 | 8.319 | COMPLETE |
| 3 | HDPE 6KG | 110 | 1.286 | COMPLETE |
| 4 | HDPE 6KG | 125 | .638 | COMPLETE |
| 5 | HDPE 6KG | 140 | .866 | COMPLETE |
| 6 | HDPE 6KG | 160 | .199 | COMPLETE |
| 7 | HDPE 6KG | 180 | .206 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 600 |