Project Completion Certificate (Ground Water)
Scheme ID: 20091738 Name of Scheme: NOORPUR & KHARBANDI KUIYAN BOOT MVS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 6967 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Jun-2027 Actual Date of Completion (Capex): 19-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 46.44 MTR/225.80 MTR NOORPUR & KHARBANDI KUIYAN BOOT 27.38636 79.55725
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 750 LPM/65 MTR NOORPUR & KHARBANDI KUIYAN BOOT 27.38636 79.55725
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400 KL/18 MTR NOORPUR & KHARBANDI KUIYAN BOOT 27.38636 79.55725
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.8833
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 6.070
2 HDPE PIPE 63 10.424
3 HDPE PIPE 110 0.869
4 HDPE PIPE 160 0.925
5 HDPE PIPE 180 1.849
HSC Connection
Sno. Total Nos.
Other Details
6.68
6.45
6.83
19-Jul-2026
20-Jul-2026