Project Completion Certificate (Ground Water)
Scheme ID: 20092169 Name of Scheme: Rautdari Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1590 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Oct-2024 Actual Date of Completion (Capex): 15-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12/140.19 Rautdaree 26.685 83.229
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 21/39 Rautdaree 26.685 83.229
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/12 Rautdaree 26.685 83.229
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.024 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.39 Laying Completed
2 hdpe 75 0.19 Laying Completed
HSC Connection
Sno. Total Nos.
1 229
Other Details
1.27
0.00
1.27
13-Jun-2026
10-Aug-2026