Project Completion Certificate (Ground Water)
Scheme ID: 20092574 Name of Scheme: FATANPUR MVS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1513 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 14-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12.08 M /118.05 M FATANPUR 27.42639 79.33292
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 300 LPM / 59 M FATANPUR 27.42639 79.33292
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 12 M FATANPUR 27.42639 79.33292
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.03 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.886 COMPLETE
2 HDPE 63 5.043 COMPLETE
3 HDPE 140 1.407 COMPLETE
HSC Connection
Sno. Total Nos.
1 314
Other Details
1.92
1.88
1.92
14-Apr-2024
15-Apr-2024