Project Completion Certificate (Ground Water)
Scheme ID: 20092652 Name of Scheme: KALYANPUR LALA Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 6
Total Population Covered: 3220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-May-2024 Actual Date of Completion (Capex): 27-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 24.11M/59.07M Kalyanpur Lala 26.387915 83.019818
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 680LPM/44M Kalyanpur Lala 26.387915 83.019818
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 200KL/14MTR Kalyanpur Lala 26.387915 83.019818
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.040 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.351
2 HDPE Pipe PN-6: Class PE-100 75 2.717
3 HDPE Pipe PN-6: Class PE-100 63 11.334
4 HDPE Pipe PN-6: Class PE-100 110 0.551
5 HDPE Pipe PN-6: Class PE-100 140 0.430
6 HDPE Pipe PN-6: Class PE-100 160 0.383
7 HDPE Pipe PN-6: Class PE-100 200 2.785
HSC Connection
Sno. Total Nos.
1 427
Other Details
2.88
2.88
2.88
11-Nov-2025
12-Nov-2025