Project Completion Certificate (Ground Water)
Scheme ID: 20092692 Name of Scheme: raniya No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1655 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 31-Dec-2023 Actual Date of Completion (Capex): 10-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 6/66.34 RANIYA 26.4113392 80.0994033
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 71/350 RANIYA 26.4113392 80.0994033
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100/12 RANIYA 26.4113392 80.0994033
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.77 COMPLETE
2 HDPE 90 1.18 COMPLETE
3 HDPE 110 0.2 COMPLETE
4 HDPE 140 0.7 COMPLETE
HSC Connection
Sno. Total Nos.
1 535
Other Details
1.73
0.00
1.82
21-Apr-2024
22-Apr-2024