Project Completion Certificate (Ground Water)
Scheme ID: 20092700 Name of Scheme: BHAINSARI & RAUKRI MVS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 4728 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Jun-2027 Actual Date of Completion (Capex): 20-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.33/143.17 BHAINSARI 27.65766 79.20067
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 950 LPM/63 MTR BHAINSARI 27.65766 79.20067
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KKL/16 M BHAINSARI 27.65766 79.20067
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0195
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.567
2 HDPE PIPE 63 7.643
3 HDPE PIPE 110 0.260
4 HDPE PIPE 140 0.778
5 HDPE PIPE 160 0.598
6 HDPE PIPE 180 0.344
7 HDPE PIPE 200 0.838
HSC Connection
Sno. Total Nos.
1 740
Other Details
4.00
3.88
3.84
20-Jul-2026
02-Aug-2026