Project Completion Certificate (Ground Water)
Scheme ID: 20092845 Name of Scheme: CHAKIYA MAHASI (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 3386 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Oct-2024 Actual Date of Completion (Capex): 31-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 24/222.5 chakaiya 27.737541 81.354532
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 42 (M³)/45M chakaiya 27.737541 81.354532
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZnAl Tank 200kl/12m chakaiya 27.737541 81.354532
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.273
2 HDPE 75 0.321
3 HDPE 90 0.824
4 HDPE 110 0.434
5 HDPE 125 0.243
6 HDPE 160 0.749
7 HDPE 180 1.186
HSC Connection
Sno. Total Nos.
1 300
Other Details
2.34
2.34
2.27
03-Jun-2026
03-Aug-2026