Project Completion Certificate (Ground Water)
Scheme ID: 20092859 Name of Scheme: MOHANAPUR GANGAPUR MIHIPURWA (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1631 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Oct-2024 Actual Date of Completion (Capex): 31-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 24/197.25 mohanpur gangapur 27.976872 81.508188
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 21/45 mohanpur gangapur 27.976872 81.508188
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZnAl Tank 100KL/16M mohanpur gangapur 27.976872 81.508188
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 35
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.501
2 HDPE 75 0.027
3 HDPE 90 0.360
4 HDPE 110 0.595
5 HDPE 125 0.113
6 HDPE 140 0.971
HSC Connection
Sno. Total Nos.
1 407
Other Details
1.62
1.62
1.83
08-Jun-2026
02-Aug-2026