Project Completion Certificate (Ground Water)
Scheme ID: 20092907 Name of Scheme: Ganveria Bujurg Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2512 Base Year: 2022 Intermediate Year: 2039 Design Year: 2052
Date of Completion (As per Contract): 28-Oct-2024 Actual Date of Completion (Capex): 06-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 32.00/74.71 Ganveria Bujurg 27.2374 82.36275
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 420 LPM Discharge/ 39 mtr Head Ganveria Bujurg 27.2374 82.36275
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/12 Mtr Ganveria Bujurg 27.2374 82.36275
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.0208
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 1.118
2 HDPE 110 0.231
3 HDPE 90 0.414
4 HDPE 75 0.798
5 HDPE 63 5.751
HSC Connection
Sno. Total Nos.
1 239
Other Details
1.52
0.00
1.72
06-Dec-2025
06-Dec-2025