| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20092908 | Name of Scheme: BHITI Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 11 |
| Total Population Covered: 10348 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-May-2024 | Actual Date of Completion (Capex): 09-Jul-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 39.29/57.57 | BHITI | 26° 28' 31.0908" N | 82° 17' 59.8452" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 103.2/48 | BHITI | 26° 28' 31.0908" N | 82° 17' 59.8452" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC Tank | 500/18 | BHITI | 26° 28' 31.0908" N | 82° 17' 59.8452" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 150 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 29.1885 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 6.123 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 2.968 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 3.381 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 2.039 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 2.193 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 200 | 1.462 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1650 |