Project Completion Certificate (Ground Water)
Scheme ID: 20092950 Name of Scheme: JAMALLUDEEN JOT RISIA (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2400 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Sep-2024 Actual Date of Completion (Capex): 30-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 24m/131.14m jamalludeen jot 27.766179 81.565719
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 33M^3/45MTR jamalludeen jot 27.766179 81.565719
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC OVERHEAD TANK 150KL/12MTR jamalludeen jot 27.766179 81.565719
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.998
2 HDPE 75 0.137
3 HDPE 90 0.058
4 HDPE 110 0.384
5 HDPE 160 1.301
HSC Connection
Sno. Total Nos.
1 490
Other Details
2.02
2.02
1.95
06-May-2026
25-May-2026