Project Completion Certificate (Ground Water)
Scheme ID: 20093030 Name of Scheme: SHARFUDDIN PUR SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1867 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 01-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 9.30 M / 85.41 M SHARFUDDIN PUR 27.24901 79.57470
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 200 LPM / 59 M SHARFUDDIN PUR 27.24901 79.57470
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 12 M SHARFUDDIN PUR 27.24901 79.57470
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .019 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 6KG 90 1.426 COMPLETE
2 HDPE 6KG 63 2.563 COMPLETE
3 HDPE 6KG 110 .331 COMPLETE
4 HDPE 6KG 125 .315 COMPLETE
5 HDPE 6KG 140 .607 COMPLETE
HSC Connection
Sno. Total Nos.
1 397
Other Details
1.61
1.57
1.61
01-May-2024
02-May-2024